Chain only. One boulder at a time. This calculator checks one boulder load against 49 CFR 393.136: the chain pattern for the shape, the aggregate working load limit, the hardwood blocking. Only chain may be used as a tiedown for a large boulder. Webbing, rope and wire rope are not allowed.
Enter the boulder, the blocking and the chains. Every answer updates as you change each field.
The boulder
Section 393.136 applies above 11,000 lb or above 2 cubic meters. Enter the volume when the weight is not known: a rock over 2 cubic meters falls under the boulder rules whatever it weighs.
Shape and placement
The chains
Chains anchored on opposite sides count at their full working load limit in the aggregate. Chains anchored on the same side count at half (49 CFR 393.106(d)).
Ready to roll
Every check passed. The securement meets 49 CFR 393.136 for this boulder.
| Check | Result | Detail |
|---|---|---|
| Scope: 49 CFR 393.136 | Pass | This boulder weighs 15,000 lb, above the 11,000 lb threshold in 49 CFR 393.136(a)(1). The boulder rules apply. |
| Chain-only tiedowns | Pass | Chain is the only tiedown material allowed for large boulders (393.136(c)(1)). |
| Chain pattern | Pass | Two or more chain tiedowns placed transversely across the vehicle, as close as possible to the wood blocking (393.136(d)(1), (d)(3)). |
| Chain count | Pass | 2 chain tiedowns entered. At least 2 are required (393.136(d)(1)). |
| Aggregate working load limit | Pass | Aggregate working load limit 13,200 lb against a required 7,500 lb, half the boulder weight. Each chain counts in full because it runs over the top to anchor points on opposite sides of the vehicle (393.106(d)(3), 393.136(d)(2)). |
| Hardwood blocking pieces | Pass | 2 hardwood blocking pieces entered. At least 2 are required (393.136(b)(2)). |
| Blocking size | Pass | Hardwood blocking at least 4 in by 4 in (393.136(b)(2)). |
| Blocking extends the full width | Pass | Blocking extends the full width of the boulder (393.136(b)(2)). |
| Blocking placed symmetrically | Pass | Blocking is placed as symmetrically as possible under the boulder (393.136(b)(3)). |
| Blocking supports three-fourths of the length | Pass | Blocking supports at least three-fourths of the boulder length (393.136(b)(3)). |
| Flattest side down | Info | Each boulder travels with its flattest and largest side down (393.136(b)(1)). |
| Tiedown placement | Info | Tiedowns in direct contact with the boulder should sit in valleys or notches across the top where possible, arranged to prevent sliding across the rock surface (393.136(c)(2)). |
The figures
| Figure | Value | Note |
|---|---|---|
| Boulder weight | 15,000 lb | 6,804 kg |
| Shape | Cubic | 49 CFR 393.136(d) |
| Chain | 3/8 in Grade 70 transport | Working load limit from the 49 CFR 393.108 chain table |
| Working load limit per chain | 6,600 lb | Lowest component or anchor point governs (393.108(a)) |
| Required aggregate working load limit | 7,500 lb | Half the boulder weight (393.136(d)(2)) |
| Aggregate working load limit | 13,200 lb | 2 chains over the top to opposite sides, full working load limit each (393.106(d)(3)) |
| Margin | 5,700 lb above the requirement | Add a chain or move up a size if the margin runs short |
| Minimum chains | 2 transverse chains | 393.136(d)(1) |
What to do
- No fixes needed. Recheck the chains at the first 50 mile inspection (392.9(b)).
Notes
- The working load limit of a tiedown is the lowest working load limit of any component, including the tensioner, or the working load limit of the anchor points, whichever is less (393.108(a)).
- Damaged tiedowns are prohibited (393.104(b)). A damaged chain does not count toward the chain count or the aggregate working load limit. A damaged tiedown is a violation, not an out-of-service item.
- Unmarked chain counts as Grade 30 proof coil chain (393.108(d)). Manufacturer markings govern over the table values (393.108(b)).
- Inspect the cargo and the securement devices within the first 50 miles and reexamine them at each change of duty status, after 3 hours, or after 150 miles, whichever comes first (392.9(b)).
- Tiedowns must not contain knots. Edge protection is required wherever a tiedown would be subject to abrasion or cutting at the point where it touches the cargo (393.104(f)).
- The flattest side is flat, so no crib is needed. A rounded flattest side would need a crib of hardwood timber fixed to the deck (393.136(b)(4)).
This calculator applies 49 CFR 393.136 to your answers, with the working load limit tables in 49 CFR 393.108 and the aggregate working load limit rule in 49 CFR 393.106(d). Confirm the measurements with a tape before you rely on a result.
Your inputs stay in this browser. Nothing is sent to our servers. There is no account to create.
Disclaimer: This tool is provided for general information only. It is not legal advice — check the current regulation and your company policy before you rely on a result.
Quick answer: A large boulder is natural irregular rock over 11,000 lb or over 2 cubic meters on an open vehicle. Only chain may tie it down. A cubic boulder needs at least two transverse chains with an aggregate working load limit of at least half the weight. A non-cubic boulder with a stable base needs an X pattern. A non-cubic boulder with an unstable base needs one chain around the top plus four blocking chains.
Every boulder sits on at least two hardwood blocking pieces at least 4 in by 4 in. This calculator checks the pattern, the working load limit and the blocking for one boulder.
What counts as a large boulder under 49 CFR 393.136?
Section 393.136 covers a large piece of natural, irregularly shaped rock weighing in excess of 5,000 kg (11,000 lb) or with a volume in excess of 2 cubic meters, carried on an open vehicle or in a vehicle whose sides are not designed and rated to contain such cargo. Either threshold triggers the section. A rock over 11,000 lb is a large boulder. A rock over 2 cubic meters is a large boulder whatever it weighs.
Two smaller classes of rock may use the boulder rules or the general cargo securement rules in 49 CFR 393.100 through 393.114. Rock weighing more than 100 kg (220 lb) but less than 5,000 kg (11,000 lb) is one class. Rock that has been formed or cut to a shape and that provides a stable base for securement is the other. The choice belongs to the carrier, but the chosen set of rules must be met in full. A load cannot mix half of one set with half of the other.
The thresholds use the words in excess of. A boulder at exactly 11,000 lb or exactly 2 cubic meters sits outside the large boulder paragraph. The general rules govern. In practice the difference rarely matters: most shippers secure a borderline boulder to the stricter boulder pattern rather than argue the boundary at a scale house. The calculator flags the exact boundary when it sees one.
A vehicle whose sides are designed and rated to contain the cargo takes the load outside the section. A dump body built and rated to carry rock is the usual example. The general rules still apply to that load. The calculator asks about the vehicle first for this reason: the answer decides which rulebook governs the run.
Why does the rule allow only chain tiedowns?
Section 393.136(c)(1) is one sentence long: only chain may be used as tiedowns to secure large boulders. Synthetic webbing, rope and wire rope are all barred, whatever their working load limit. The reason is the cargo itself. A boulder is an irregular mass of sharp rock. It cuts webbing, abrades rope and crushes anything softer than steel against its edges. Chain survives contact with rock that would destroy a strap in one trip.
The chain-only rule also shapes the rest of the section. Every working load limit in 393.136 is a chain working load limit. The calculator reads chain grade and size from the 49 CFR 393.108 table, so a 3/8 in Grade 70 transport chain counts at 6,600 lb and a 1/2 in Grade 70 chain counts at 11,300 lb. Unmarked chain counts as Grade 30 proof coil, which cuts the value sharply: an unmarked 3/8 in chain counts at 2,650 lb. Markings matter on a boulder load more than on any other commodity.
Chain still needs care. A chain with a cracked link, a stretched link or a damaged tensioner is prohibited under 49 CFR 393.104(b). A damaged chain does not count toward the chain count or the aggregate working load limit. Tiedowns must not contain knots. Edge protection is required wherever a tiedown would be subject to abrasion or cutting at the point where it touches the cargo. A damaged tiedown is a violation, not an out-of-service item, but the violation still costs the carrier at inspection.
Heavy equipment is the closest comparison among the commodity rules: the Heavy Equipment Securement Calculator checks the four tiedown minimum and the mounting point rules in 49 CFR 393.130 for machines over 10,000 lb.
How do you secure a cubic boulder?
A cubic shaped boulder takes the simplest pattern in the section. Section 393.136(d) requires at least two chain tiedowns placed transversely across the vehicle, one boulder secured individually. The aggregate working load limit of the tiedowns must be at least half the weight of the boulder. The tiedowns must be placed as closely as possible to the wood blocking used to support the boulder.
The transverse pattern works because a cubic boulder has flat faces and a stable footprint. The chains run over the top and anchor on opposite sides of the vehicle, which lets each chain count at its full working load limit in the aggregate. Two 3/8 in Grade 70 chains give 13,200 lb of aggregate working load limit, enough for any boulder up to 26,400 lb. A heavier boulder needs a third chain or a larger size.
Placement near the blocking is part of the rule, not a suggestion. A chain that runs far from the blocking can roll the boulder off its supports when it tensions. Set the chains close to the blocking pieces. Seat them in valleys or notches across the top of the boulder where possible, arranged so they cannot slide across the rock surface. Section 393.136(c)(2) requires that arrangement.
How do you secure a non-cubic boulder with a stable base?
A boulder that is not cubic but still sits on a stable base takes an X pattern. Section 393.136(e) requires at least two chain tiedowns forming an X pattern over the boulder. The aggregate working load limit must be at least half the weight of the boulder, the same half-weight test as a cubic boulder. The tiedowns must pass over the center of the boulder and must be attached to each other at the intersection by a shackle or other connecting device.
The X pattern restrains a boulder that a transverse pair would let shift. An irregular boulder has no flat faces for transverse chains to bite on, so the crossing chains hold it from four directions at once. The shackle at the intersection is what makes the X a single system instead of two loose diagonals. Without the connector the chains can walk apart under load.
The base decides between the two non-cubic patterns. A boulder that sits flat and steady on the deck takes the X pattern. A boulder that rocks, rolls or tips takes the top chain plus four chain pattern in the next section. When the base is in doubt, treat it as unstable: the heavier pattern costs one more chain and removes the argument.
How do you secure a boulder with an unstable base?
An unstable base calls for the heaviest securement in the section. Section 393.136(f) requires a combination of chain tiedowns. One chain must surround the top of the boulder at a point between one-half and two-thirds of its height. The working load limit of that chain alone must be at least half the weight of the boulder. Four more chains must be attached to the surrounding chain and the vehicle to form a blocking mechanism that prevents any horizontal movement. Each of the four must have a working load limit of at least one-fourth the weight of the boulder.
The numbers are the trap in this pattern. A 20,000 lb boulder needs a top chain rated at 10,000 lb or better, which means 1/2 in Grade 70 chain at 11,300 lb or larger. A 3/8 in Grade 70 top chain at 6,600 lb fails the test on its own, whatever the blocking chains carry. Each blocking chain needs 5,000 lb, which a 3/8 in Grade 70 chain meets at 6,600 lb. The calculator checks the top chain and the blocking chains separately so a shortfall in either one shows up on its own line.
The four blocking chains should run at 45 degrees or less from horizontal where practicable. A steep chain pulls the boulder down more than it holds it sideways. The blocking mechanism then loses its grip on horizontal movement. Lower anchor points or longer chains bring the angle down. The rule says where practicable, so the calculator treats a steep angle as a check rather than a fail, but a flat pull is still the aim on every load.
What blocking does a boulder need?
Every boulder in the section sits on blocking. Section 393.136(b)(2) requires at least two pieces of hardwood blocking at least 10 cm by 10 cm (4 in by 4 in) in side dimensions, extending the full width of the boulder. Softwood does not meet the rule. A single piece does not meet the rule. Pieces that stop short of the full width do not meet the rule.
Section 393.136(b)(3) places the blocking: as symmetrically as possible under the boulder, supporting at least three-fourths of the length of the boulder. The symmetry is a must. The three-fourths support is a should, which is why the calculator treats short support as a check rather than a fail. The distinction is real in the regulation text. The tool follows the text.
A boulder whose flattest side is rounded or partly rounded, so that the boulder may roll, must be placed in a crib made of hardwood timber fixed to the deck of the vehicle. The boulder rests on both the deck and the timber, with at least three well-separated points of contact that prevent its tendency to roll in any direction. A flat deck and two blocking pieces are not enough for a round-bottomed boulder. Build the crib before the boulder goes on the deck.
Two more placement rules round out the section. Each boulder must be placed with its flattest and largest side down. If a boulder is tapered, the narrowest end must point toward the front of the vehicle. Both rules are easy to miss in a hurry and easy to check before the first chain goes on. The calculator asks about taper and about the rounded side so neither rule slips past.
Blocking is a shared theme across the commodity rules. The Concrete Pipe Securement Calculator checks a similar timber blocking rule for pipe loads: blocking symmetric about the center, timber at least 4 in by 6 in, different diameters grouped separately.
How is aggregate working load limit figured for boulder chains?
The half-weight test in 393.136 runs on the aggregate working load limit defined in 49 CFR 393.106(d). The aggregate is a sum with three different weights. A tiedown that runs from an anchor point on the vehicle to an anchor point on the cargo counts at half its working load limit. A tiedown that passes over the cargo and anchors on the same side of the vehicle counts at half. A tiedown that passes over the cargo and anchors on the other side counts in full.
Boulder chains almost always run over the top to opposite sides, so they count in full. That is the pattern the rule itself requires: transverse chains across the vehicle, or an X over the boulder. A chain that runs over the top and hooks back to the same rail loses half its value in the aggregate. A two-chain setup that passes on paper can fail in the yard. The calculator asks how the chains run and applies the right factor.
The working load limit of each chain comes from 49 CFR 393.108. Manufacturer markings govern. When a chain is not marked, the table values apply. Unmarked chain counts as Grade 30 proof coil. The working load limit of a tiedown is the lowest working load limit of any component, including the tensioner, or the working load limit of the anchor points, whichever is less. A strong chain on a weak anchor point is a weak tiedown.
The half-weight figure is the standard test across the commodity rules, with one notable exception: log loads use one-sixth of the stack weight under 49 CFR 393.116, a figure drivers often get wrong. The Log Securement Calculator runs the one-sixth test for shortwood and longwood stacks.
The full tiedown working load limit tables live on the Flatbed Calculator, which carries the chain, webbing, wire rope, rope and steel strapping tables from 49 CFR 393.108 plus the general cargo securement rules.
What if the rock is under 11,000 pounds?
Rock between 220 lb and 11,000 lb may be secured under 49 CFR 393.136 or under the general rules in 49 CFR 393.100 through 393.114. The carrier picks one set and meets it in full. The boulder pattern is usually the simpler choice for a single large rock: chain, blocking and a known pattern. The general rules suit a mixed load where the rock rides with other cargo.
Under the general rules the aggregate working load limit must still be at least half the cargo weight. The tiedown count follows 49 CFR 393.110: one tiedown for cargo up to 5 ft long and up to 1,100 lb when unblocked, two tiedowns for longer or heavier cargo, more for cargo over 10 ft. The Flatbed Calculator runs the general count and the aggregate working load limit for any load. The boulder calculator points there whenever the rock falls outside 393.136.
Rock at or under 220 lb falls outside 393.136 entirely. Secure it under the general rules. Rock contained within a vehicle designed to carry such cargo is also outside the section: the vehicle sides do the containing while the general rules govern the rest. The calculator returns the general-rules path for both cases instead of running boulder checks that do not apply. The Pre-Trip Inspection Checklist carries the cargo securement items to check before you roll.
How do you use the Large Boulder Securement Calculator?
Work through the form in order. The calculator updates every answer as each field changes.
- Enter the boulder weight in pounds and the volume in cubic meters when the weight is not known. The section applies above 11,000 lb or above 2 cubic meters.
- Pick the rock type and the vehicle. Formed or cut rock with a stable base may use the boulder rules or the general rules. A vehicle with sides designed and rated to contain rock takes the load outside the section.
- Pick the shape, the flattest side and the taper. The shape sets the chain pattern: transverse for cubic, X for a stable base, top chain plus four for an unstable base.
- Enter the blocking: the number of hardwood pieces, the size, the width, the symmetry and the length supported. A rounded flattest side needs a crib.
- Enter the chains: the material, the pattern, the grade, the size and the count. The calculator reads the working load limit from the 49 CFR 393.108 table.
- Read the verdict, the check table, the figures and the actions. A Fail result names the fix. Copy the summary for the trip records, or reset the calculator to start over.
Frequently asked questions
How many chains does a large boulder need?
A cubic boulder needs at least two chain tiedowns placed transversely across the vehicle. A non-cubic boulder with a stable base needs at least two chains in an X pattern. A non-cubic boulder with an unstable base needs one chain around the top plus four blocking chains, five chains in total.
Can I use straps or webbing to secure a boulder?
No. Only chain may be used as tiedowns to secure large boulders under 49 CFR 393.136(c)(1). Synthetic webbing, rope and wire rope are not allowed, whatever their working load limit.
What size chain do I need for a 15,000 pound boulder?
The aggregate working load limit must be at least half the weight, which is 7,500 lb for a 15,000 lb boulder. Two 3/8 in Grade 70 transport chains give 13,200 lb when they run over the top to anchor points on opposite sides, which clears the requirement with 5,700 lb to spare. Two 3/8 in Grade 30 chains give only 5,300 lb and fail the test.
What blocking does a boulder need?
At least two pieces of hardwood blocking at least 4 in by 4 in, extending the full width of the boulder, placed as symmetrically as possible and supporting at least three-fourths of the boulder length. A boulder with a rounded flattest side needs a crib of hardwood timber fixed to the deck, with at least three well-separated points of contact.
Does 49 CFR 393.136 apply to a boulder under 11,000 pounds?
Rock weighing more than 220 lb but less than 11,000 lb may be secured under 49 CFR 393.136 or under the general rules in 49 CFR 393.100 through 393.114. Rock at or under 220 lb falls outside the section. The general rules govern. Formed or cut rock with a stable base may use either set of rules at any weight.
How often must I check boulder securement in transit?
Inspect the cargo and the securement devices within the first 50 miles after beginning the trip, then reexamine them at each change of duty status, after 3 hours, or after 150 miles, whichever comes first, under 49 CFR 392.9(b). Add more securement devices whenever an inspection shows the load can shift.
Related tools
- Flatbed Calculator: the general cargo securement rules and the full tiedown working load limit tables from 49 CFR 393.108.
- Heavy Equipment Securement Calculator: the four tiedown minimum and the mounting point rules for machines over 10,000 lb under 49 CFR 393.130.
- Log Securement Calculator: the one-sixth aggregate working load limit test for shortwood and longwood stacks under 49 CFR 393.116.
- Concrete Pipe Securement Calculator: timber blocking and bell pipe rules for concrete pipe loads under 49 CFR 393.124.
- Crushed Vehicle Securement Calculator: containment walls and tiedown counts for flattened vehicles under 49 CFR 393.132.
- Pre-Trip Inspection Checklist: the full pre-trip list, including the cargo securement items to check before you roll.
Sources
- 49 CFR 393.136, Specific securement requirements for large boulders. Cornell LII, read 19 Nov 2026.
- 49 CFR 393.106, General requirements for securing articles of cargo. Cornell LII, read 19 Nov 2026.
- 49 CFR 393.108, Determining the working load limit of a tiedown or the load restraining value of a friction mat. Cornell LII, read 19 Nov 2026.
- 49 CFR 393.104, Standards for cargo securement devices and systems. Cornell LII, read 19 Nov 2026.
- 49 CFR 392.9, Inspection of cargo, cargo securement devices and systems. Cornell LII, read 19 Nov 2026.