One machine at a time. This calculator checks one machine against 49 CFR 393.130, the aggregate working load limit rule in 393.106(d) and the general count rule in 393.110. A result that says Fix before you roll means the machine must not move until every failed check is fixed.

Enter the weight, pick the setup, enter the tiedowns. Every answer updates as you change each field.

The machine

The tiedowns

Length and blocking (optional)

Length sets the general count rule in 49 CFR 393.110. Leave it blank to check the 49 CFR 393.130 rules only.

Ready to roll

The setup meets the tiedown count and the aggregate working load limit for a 20,000 lb machine under 49 CFR 393.130.

CheckResultDetail
Tiedown countPass4 tiedowns entered. The minimum is 4 under 49 CFR 393.130.
Aggregate working load limitPassCredited 13,200 lb against 10,000 lb required. Margin 3,200 lb.
Accessory equipmentPassAccessory equipment is completely lowered and secured to the vehicle.
Articulation restraintInfoThe machine is not articulated.
Attachment pointsPassTiedowns use mounting points the maker designed for that purpose.

The figures

FigureValueNote
Equipment weight20,000 lb–
Rule that applies49 CFR 393.130–
Minimum tiedowns4Pass
Tiedowns entered4–
Credit per tiedown3,300 lb (one-half of 6,600 lb)–
Aggregate WLL credited13,200 lbPass
Aggregate WLL required10,000 lb–
Margin+3,200 lbPass

What to do

  • No actions for this result.

Notes

  • Recheck the cargo and the tiedowns within the first 50 miles and again at every duty-status change, after 3 hours, or after 150 miles, whichever comes first. (49 CFR 392.9)
  • The working load limit of a tiedown is the lowest working load limit of any component, including the tensioner, or the anchor points, whichever is less. (49 CFR 393.108(a))
  • A damaged tiedown does not count toward the tiedown count or the aggregate working load limit. A damaged tiedown is a violation, not an out-of-service condition.
  • Enter the equipment length to check the general count rule in 49 CFR 393.110. A machine over 30 ft long can need more than 4 tiedowns.

This calculator applies 49 CFR 393.130, 393.106, 393.108 and 393.110 to your answers. Confirm the tiedown ratings on the markings before you rely on a result.

Your inputs stay in this browser. Nothing is sent to our servers. There is no account to create.

Disclaimer: This tool is provided for general information only. It is not legal advice — check the current regulation and your company policy before you rely on a result.

Quick answer: Heavy equipment on wheels or tracks that weighs 10,000 lb or more needs at least four tiedowns under 49 CFR 393.130. The tiedowns must restrain the machine against lateral, forward, rearward or vertical movement and sit as close as practicable to the front and rear or on designed mounting points. Accessories must be completely lowered and secured. An articulated machine must be restrained against articulation. The aggregate working load limit must still reach one-half the machine weight. This calculator checks the count, the strength, the accessories, the articulation and the attachment points in one pass.

Last reviewed: · Focus keyword: heavy equipment securement

How many tiedowns does heavy equipment need?

Four. Section 393.130(c)(1) sets a minimum of four tiedowns for heavy vehicles, equipment and machinery on wheels or tracks that weigh 10,000 lb or more. The four tiedowns must restrain the machine against movement in four directions: lateral, forward, rearward or vertical. A tiedown that holds the machine down but lets it slide sideways does not meet the rule.

Four is a floor, not a target. The general count rule in 49 CFR 393.110 can ask for more on a long machine. An unblocked article over 10 ft long needs two tiedowns for the first 10 ft plus one more for each additional 10 ft or part of 10 ft. A 35 ft machine needs five tiedowns under that rule even though 393.130 asks for four. This calculator checks both rules and uses the higher number.

A blocked machine follows a different count. Under 393.110(c), an article blocked against forward movement by a headerboard, a bulkhead or other blocking needs one tiedown for each 10 ft of length or part of 10 ft. A blocked 35 ft machine needs four tiedowns under that rule, which matches the 393.130 floor. Blocking never reduces the count below four on a machine that 393.130 covers.

Count alone does not make a load legal. The tiedowns must also pass the strength test in 393.106(d): the aggregate working load limit must reach at least one-half the machine weight. A 40,000 lb machine held by four light straps fails that test even though the count is right. The next section works through the strength math. The Flatbed Calculator carries the full working load limit tables for chain, webbing, wire rope and strapping.

What is the 10,000-pound rule for heavy equipment securement?

Section 393.130(a) draws the line at 4,536 kg, which is 10,000 lb. The rule covers heavy vehicles, equipment and machinery that operate on wheels or tracks and individually weigh 10,000 lb or more. The regulation names front end loaders, bulldozers, tractors and power shovels as examples. The list is open: any machine on wheels or tracks at or above the weight falls under the rule.

The weight counts per machine, not per load. Two 6,000 lb machines on one trailer are two articles at 6,000 lb each, not one article at 12,000 lb. Each machine takes its own securement check. A trailer full of light machines never becomes a heavy equipment load by addition.

A machine under 10,000 lb has three options. Section 393.130(a) says lighter equipment may be secured under 393.130, under 393.128, or under the general rules in 393.100 through 393.114. Under the general count rule, a machine over 5 ft long needs at least two tiedowns. Many drivers still use four tiedowns on a lighter machine because the setup is simple and it passes every option at once.

Automobiles, light trucks and vans have their own rule at 393.128, with a minimum of two tiedowns for vehicles at 10,000 lb or less. A vehicle over 10,000 lb must be secured under 393.130 instead. The crossover runs one way: heavy always lands on 393.130. The Auto Transport Securement Calculator covers the lighter vehicle rule and flags the crossover.

How does the aggregate working load limit work for heavy equipment?

The count rule and the strength rule run side by side. Section 393.106(d) requires the aggregate working load limit of the tiedowns to reach at least one-half the weight of the article. Section 393.106(a) says the general rules apply to the cargo types in the commodity-specific sections. The commodity rules take precedence only where they add requirements. Section 393.130 adds a four-tiedown minimum. It does not remove the strength test.

The aggregate is a credited sum, not a simple total. A direct tiedown, which runs from an anchor point on the vehicle to an anchor point on the machine, counts at one-half its working load limit. An indirect tiedown that passes over the machine and returns to the same side also counts at one-half. An indirect tiedown that crosses to the other side counts at its full working load limit. Routing changes the credit, so the same four chains can pass or fail on routing alone.

Work the numbers before you load. A 20,000 lb machine needs 10,000 lb of aggregate working load limit. Four 3/8-inch Grade 70 chains used direct credit 4 times 6,600 times one-half, which is 13,200 lb, so the setup passes with 3,200 lb to spare. The same four chains on a 40,000 lb machine credit 13,200 lb against 20,000 lb required, so the setup fails by 6,800 lb. The count is right in both cases. The strength is what changes.

The working load limit of a tiedown is the lowest working load limit of any component, including the tensioner, or the anchor points, whichever is less. A 6,600 lb chain on a 5,000 lb anchor point is a 5,000 lb tiedown. Manufacturer markings govern the rating. Unmarked chain counts as Grade 30 proof coil, which rates far below Grade 70 at the same size. The same aggregate rule covers every commodity, from metal coils to large boulders, so the math here transfers to any load.

TiedownWorking load limit
3/8-in Grade 70 transport chain6,600 lb
1/2-in Grade 70 transport chain11,300 lb
5/16-in Grade 70 transport chain4,700 lb
3/8-in Grade 43 high-test chain5,400 lb
3/8-in Grade 30 proof-coil chain2,650 lb
4-in synthetic webbing4,000 lb

These values come from the tables in 49 CFR 393.108 and apply when the tiedown carries no manufacturer marking. A marked tiedown uses the marked value. The Flatbed Calculator lists the full tables, including wire rope, cordage and steel strapping.

Do accessories have to be lowered before transport?

Yes. Section 393.130(b)(1) requires accessory equipment, such as hydraulic shovels, to be completely lowered and secured to the vehicle. A bucket, a blade, a boom, a ripper or a set of forks counts as accessory equipment. The rule covers anything attached to the machine that can move on its own.

Completely lowered means resting on the deck or on the machine, not held up by hydraulic pressure. A raised boom changes the center of gravity and can swing or drop when the hydraulics bleed off on a long haul. Secured means tied or pinned in place, not left to rest on a hydraulic lock. A chain across the bucket or a pin through the boom gives the restraint the rule asks for.

Lower the accessories before the first tiedown goes on. A lowered bucket or blade often covers the best attachment points. A raised boom blocks the path of a chain. The loading order matters: park the machine, lower the accessories, fit the articulation lock if the machine has one, then set the tiedowns.

What counts as a proper tiedown attachment point?

Section 393.130(c)(2) gives two choices. Each tiedown must be affixed as close as practicable to the front and rear of the vehicle, or to mounting points on the vehicle that have been specifically designed for that purpose. The word practicable gives room for the real deck: a tiedown cannot always sit at the exact front corner. It cannot sit in the middle of a long machine and still restrain the ends.

Designed mounting points are the best choice when the machine has them. Most machines carry D-rings, tie-down lugs or frame eyes the maker put there for transport. The operator manual shows where they sit and what they are rated for. A tiedown on a designed point pulls on the frame, which is the strongest part of the machine.

Never attach to a part that cannot hold the load. A hydraulic line, a cab guard, a sheet-metal panel or a light bracket is not an anchor point. A tiedown on a weak part can bend the part, cut the tiedown or come free on the first hard stop. The anchor point on the trailer matters just as much: the tiedown rating drops to the anchor point rating when the anchor point is weaker. Edge protection is required where a tiedown would be cut or abraded at the contact point. (49 CFR 393.104(f)(4))

How do you secure an articulated machine?

Section 393.130(b)(2) requires articulated vehicles to be restrained in a manner that prevents articulation while in transit. The rule covers machines with a joint in the frame, such as articulated dump trucks, wheel loaders and motor graders. The joint lets the machine steer by bending in the middle. The same joint lets the machine flex and walk on the deck if nothing holds it.

Most articulated machines ship with a steering-frame lock: a bar or a pin that bridges the joint. Fit the lock before loading. Check that it is pinned in place before the tiedowns go on. Chains alone do not stop articulation. A chained machine can still flex at the joint and work the chains loose over a long haul.

If the machine has no lock, restrain the joint with a tiedown or a rigid bar across the articulation point, as the maker directs. The goal is simple: the front half and the rear half must move as one rigid unit for the whole trip. A machine that can still bend at the joint is not ready to roll.

What should the driver check on the road?

The driver must inspect the cargo and the securement devices before driving and recheck within the first 50 miles after beginning the trip. The driver must reexamine during the trip whenever the duty status changes, after 3 hours of driving, or after 150 miles, whichever comes first. (49 CFR 392.9) The driver must make adjustments and add tiedowns whenever a check finds a problem.

The first recheck catches most problems. A wheeled machine sits on tires that compress under chain tension and rebound on the road, so chains that were tight in the yard go slack in the first miles. A tracked machine has no suspension, so chains stay tight once set, but binders can still shift on the first bump. Put a hand on every chain and binder at the first stop.

A damaged tiedown does not count toward the tiedown count or the aggregate working load limit. A cut strap, a stretched link or a cracked hook is out of the calculation. Using one is a violation. The Pre-Trip Inspection Checklist carries the cargo securement checks alongside the rest of the walk-around. Other loads have their own commodity rules: logs, concrete pipe, paper rolls and lumber each carry extra requirements.

How do you use the Heavy Equipment Securement Calculator?

  1. Enter the equipment weight in pounds and pick wheels, crawler tracks or neither.
  2. Say whether the machine is articulated and whether it is restrained against articulation.
  3. Say whether the accessory equipment is lowered and secured, or whether the machine has none.
  4. Enter the tiedown count, pick the tiedown type and routing, then pick the attachment points.
  5. Enter the equipment length to check the general count rule. Say whether the machine is blocked against forward movement.
  6. Read the verdict, the check table, the figures and the notes. Copy the summary for the trip records, or reset the calculator to start over.

Frequently asked questions

How many tiedowns are required for heavy equipment?

Heavy equipment on wheels or tracks that weighs 10,000 lb or more needs at least four tiedowns under 49 CFR 393.130. The tiedowns must restrain the machine against lateral, forward, rearward or vertical movement. Four is the minimum: a long machine can need more under the general count rule in 49 CFR 393.110. The aggregate working load limit must still reach one-half the machine weight.

Does a 9,000-pound machine need four tiedowns?

No, not by force of 49 CFR 393.130, which applies at 10,000 lb or more. A machine under 10,000 lb may be secured under 393.130, under 393.128, or under the general rules in 393.100 through 393.114. Under the general count rule, a machine over 5 ft long needs at least two tiedowns. Many drivers still use four tiedowns on a lighter machine because it is simple and it passes every option.

What is the aggregate working load limit for a 20,000-pound machine?

The aggregate working load limit must reach at least one-half the weight, so 10,000 lb for a 20,000 lb machine. (49 CFR 393.106(d)) A direct tiedown counts at one-half its working load limit. An indirect tiedown that crosses to the other side counts at its full working load limit. Four 3/8-inch Grade 70 chains used direct credit 13,200 lb, which passes. The same four chains on a 40,000 lb machine credit 13,200 lb against 20,000 lb required, which fails.

Can you use straps instead of chains on heavy equipment?

Yes. Section 393.130 does not name a tiedown material. Synthetic webbing, wire rope and chain all count if the tiedown is rated for the load and the aggregate working load limit reaches one-half the machine weight. Chains are the usual choice on heavy equipment because the working load limits run higher: a 3/8-inch Grade 70 chain rates 6,600 lb against 4,000 lb for a 4-inch webbing strap. Edge protection is required where a tiedown can be cut or abraded at the contact point. (49 CFR 393.104(f)(4))

Do tracks change the securement rules?

No. Section 393.130 covers equipment with crawler tracks or wheels under the same rule: at least four tiedowns, accessories lowered and secured, articulation restrained. The method differs in practice. A tracked machine has no suspension, so chains stay tight once set. A wheeled machine sits on tires that compress under tension and rebound on the road, so the chains loosen and the first recheck within 50 miles matters more.

When must the driver recheck the load?

The driver must inspect the cargo and the securement devices before driving and recheck within the first 50 miles after beginning the trip. The driver must reexamine during the trip whenever the duty status changes, after 3 hours of driving, or after 150 miles, whichever comes first. (49 CFR 392.9) The driver must add tiedowns or make adjustments whenever the check finds a problem.

Related tools