No federal superload definition exists. Each state sets its own line. The lines differ widely. A load that is routine in one state can be a superload in the next. This checker applies the state rule as published on November 19, 2026. Confirm with the permit office before you move.
Enter the load dimensions plus the gross weight, then pick the states the load will cross. Every answer updates the result as you change each field. The tool compares the load against each state superload line and shows which threshold was crossed, plus what the move needs next.
The load
Measure the overall width plus height including the load, not the trailer alone. A load that overhangs the trailer counts at its widest point.
Overall length means the full combination: tractor, trailers, plus load. Gross weight means the full combination weight including the load.
The axle count sets the Illinois weight line: 5 axles or fewer, 100,000 lb; 6 or more axles, 120,000 lb. The axle spacing settles Texas: a load of 200,001 to 254,300 lb is superheavy only when the overall axle spacing is under 95 ft.
Nevada, Oregon, plus West Virginia set a tighter width line on two-lane highways. Pick two-lane when any part of the route runs on a two-lane road.
The states
Hold Ctrl on Windows or Command on Mac to pick more than one state. On a phone, tap each state to add it. Use Select all to check the full 50-state plus DC route.
Superload in 3 of 5 states checked.
3 superloads, 1 routine, 1 check across 5 states.
This load crosses the superload line in Arkansas, Kansas, Missouri. In those states the move needs the superload treatment: a bridge analysis on the heavy states, a route survey where the state requires one, police escorts where the permit requires them, plus a longer lead time. The table below names the threshold crossed in each state.
The states
| State | Verdict | Detail |
|---|---|---|
| Arkansas (AR) | Superload | Length at or over 100 ft (load: 110 ft). 27 CAR section 111-110. ARDOT grants superload permits only for loads essential to public health, welfare, safety, or defense. |
| Kansas (KS) | Superload | Gross weight over 150,000 lb (load: 175,000 lb). K.A.R. 36-1-35(o). Superload is weight only. Over 16 ft 6 in wide or 18 ft high means a large structure permit, a separate class. |
| Missouri (MO) | Superload | Width over 16 ft (load: 16 ft 6 in). Gross weight over 160,000 lb (load: 175,000 lb). MoDOT route survey guidance. A route survey is required for all superloads. The older 152000 lb figure is stale. |
| Oklahoma (OK) | Check axle weights | Gross weight over 80000 lb, so the load needs an overweight permit. Superload status in Oklahoma depends on the axle configuration against Standard Drawing OL-1. OAC 730:50-3-2(m). A superload is any overweight permit load that exceeds the Standard Drawing OL-1 trucks. No gross weight or dimension figure exists. |
| Texas (TX) | Routine permit | Routine permit. State line: over 254300 lb gross, or 200001 to 254300 lb with axle spacing under 95 ft. |
The figures
| Figure | Value | Note |
|---|---|---|
| Load width | 16 ft 6 in | Overall width including the load. |
| Load height | 14 ft | Overall height including the load. |
| Overall length | 110 ft | Overall length including the tractor, trailers, plus load. |
| Gross weight | 175,000 lb | Gross vehicle weight including the load. |
| Axles | 6 | Illinois sets its weight line by axle count: 5 axles or fewer, 100000 lb; 6 or more axles, 120000 lb. |
| States checked | 5 | 3 superloads, 1 routine, 1 check. |
| Widest load that stays routine | 16 ft | The lowest width line across the verified states checked. |
| Tallest load that stays routine | 15 ft 5 in | The lowest height line across the verified states checked. |
| Longest load that stays routine | 99 ft | The lowest length line across the verified states checked. |
| Heaviest load that stays routine | 150,000 lb | The lowest weight line across the verified states checked. |
What to do
- Apply early. Superload permits take days to weeks, not hours.
- Expect a bridge analysis on the heavy states, plus a route survey where the state requires one.
- Check the escort rules for each superload state. Some states require police escorts on every superload move.
- For Oklahoma, compare the axle weights plus spacings to Standard Drawing OL-1 before you apply. For Texas, measure the overall axle spacing when the weight sits in the 200001 to 254300 lb band.
What would move the verdict
- To run routine in every verified state checked, stay at or under 16 ft wide, at or under 15 ft 5 in high, at or under 99 ft long, at or under 150,000 lb.
- In Arkansas, stay at or under 99 ft long to run routine.
- In Kansas, stay at or under 150,000 lb to run routine.
- In Missouri, stay at or under 16 ft wide plus at or under 160,000 lb to run routine.
Notes
- No federal superload definition exists. Each state sets its own line. This tool applies the state rule as published.
- Thresholds verified against state sources on Nov 19, 2026. States change rules without notice. Confirm with the permit office before you move.
- Permit lead times vary by state and by load. This tool checks thresholds only. The permit office sets the lead time for each move.
This tool applies the published state superload rules to your inputs. Confirm the result with each state permit office before you move. States change rules without notice.
Your inputs stay in this browser. Nothing is sent to our servers. There is no account to create.
Disclaimer: This tool is a planning check against published state superload rules, not legal advice — confirm the thresholds plus the permit conditions with each state permit office before moving a load.
Quick answer: A superload is a load that crosses a state routine permit ceiling on width, height, length, or weight. It moves into special review. There is no federal superload definition. Each state sets its own line. Most states draw the width line at 16 ft, the height line at 16 ft, the length line at 150 ft, plus the weight line between 150,000 and 250,000 lb, but the spread is wide: Ohio treats a load as a superload over 120,000 lb, while Nevada plus Colorado wait until 500,000 lb. Superload status triggers a bridge analysis, a route survey, police escorts in some states, plus a lead time measured in days or weeks. This checker compares your load against the verified line in each state on your route.
What is a superload?
A superload is a vehicle or combination of vehicles that exceeds the routine oversize or overweight permit limits a state will issue by standard process. Above the line, the state treats the move as a special case. The permit office reviews the route in detail, checks the bridges the load will cross, plus sets conditions the routine permit never carries. The load is still legal to move. It simply needs more review, more paperwork, plus more time.
The line itself is a set of four numbers in most states: a width, a height, a length, plus a gross weight. Cross any one of them and the load is a superload in that state. A load 17 ft wide is a superload in Missouri even at 60,000 lb, because Missouri draws the width line at 16 ft. A load 300,000 lb is a superload in Utah even at legal width, because Utah draws the weight line at 300,000 lb. The four numbers work independently. Only one needs to break.
Some states use fewer than four numbers. Texas sets no dimension trigger at all: its superheavy class turns on weight plus axle spacing only. Kansas defines a superload by weight only, then handles wide loads under a separate large structure permit. California sets no gross weight trigger: its variance permit turns on width, height, length, or special hauling equipment. Michigan sets no gross weight trigger either, because Michigan weight is a per-axle question. Indiana has no weight trigger in its binding rule. Oregon has no gross weight trigger. Virginia has no gross weight trigger either. Montana has no fixed weight line: a load that needs Bridge Bureau approval is a superload on configuration plus route. The checker above applies each state rule as written, including the states that leave a dimension out.
Some states give the class a different name. Texas calls it superheavy. California calls it a variance permit. Maine calls it an extreme load. New Hampshire calls it a supermove. Arizona calls it a Class C special permit. Georgia splits it into two tiers: Superload up to 180,000 lb, then Superload Plus above it. Montana splits it into Class 1 plus Class 2 by size. The names differ. The idea is the same: above the line, the move gets special review.
The practical meaning of the label is what it triggers, not what it is called. A superload permit takes longer to issue, costs more, plus carries conditions a routine permit never has: a bridge analysis on the heavy moves, a route survey on the wide and tall ones, police escorts where the state requires them, plus travel restrictions on time of day and day of week. A carrier that quotes a superload move at routine-permit timing will miss the delivery date. The checker above shows the verdict per state so the quote can carry the real lead time.
Is there a federal superload definition?
No. No federal rule defines a superload. FMCSA does not use the term in the Federal Motor Carrier Safety Regulations. The federal size and weight rules in 23 CFR Part 658 set the legal limits a vehicle must meet to run without a permit: 8 ft 6 in wide, 80,000 lb gross on the Interstate, plus the bridge formula for axle weights. Above those limits, the state issues the permit. The state also decides where its routine permit ends plus where its superload review begins. The federal government sets the floor. The states set the superload ceiling.
That split is why the same load gets a different answer in every state. The federal rules say when a permit is needed. They say nothing about how the state should grade the permit. A state that sees heavy oilfield equipment every week can set a high weight line and still review the moves. A state with old bridges and narrow roads can set a low line and review almost everything. Both are within their rights. The result is 43 different definitions across the states that publish one, plus 7 states plus the District of Columbia that publish no definition at all.
The federal bridge formula still matters for a superload, even though it does not define one. The formula caps the weight on any group of axles by the distance between them. A superload permit can authorize weight above the formula, but only after the state checks the bridges on the route. That check is the bridge analysis. It is the main reason superload permits take so long. The formula sets the routine ceiling. The bridge analysis is what lets a load through above it.
One federal document is still useful as background: the Government Accountability Office e-supplement GAO-15-235SP, published in February 2015, collected the superload figures each state reported at the time. It is the only federal snapshot of the state lines. It is also 11 years old. Several states have changed their lines since. This checker treats the GAO figures as a lead only, never as verification. Every figure in the table below was re-checked against the state rule or the state DOT page on November 19, 2026.
How does a superload differ from an oversize load?
An oversize load is any load that exceeds the legal size or weight limits and needs a permit to move. A superload is a smaller set inside that group: a load that exceeds the routine permit limits and needs special review. Every superload is oversize. Most oversize loads are not superloads. The difference is the ceiling, not the permit.
Take a load 12 ft wide, 13 ft 6 in high, 70 ft long, at 90,000 lb. It is oversize in every state: too wide plus too heavy for legal limits. It needs a permit in every state. It is a superload in none of them. The routine permit covers it, issued online in minutes or hours, with standard conditions. Now take the same load at 17 ft wide. It is still oversize. In Missouri, North Carolina, plus most states with a 16 ft width line, it is also a superload. The permit office reviews the route, checks the bridges, plus may require a route survey plus a police escort. Same load, one foot wider, a different permit class.
The legal limits themselves vary by state, which is why the oversize question comes first. The federal width limit is 8 ft 6 in. The federal gross weight limit is 80,000 lb on the Interstate. States set their own legal height, usually 13 ft 6 in or 14 ft, plus their own legal length limits by vehicle type. The Federal Size Limits Checker works out the federal limits for a vehicle, while the State Legal Limits Table lists the legal size plus weight limits state by state. A load under the legal limits needs no permit at all. A load over them needs a routine permit. A load over the superload line needs the special review this checker tests for.
Length deserves a separate note, because the length limit that bites first is often not the superload line. The kingpin law in most states caps the distance from the kingpin to the rear axle, which limits how far back a trailer can sit. A long load can fail the kingpin rule while still sitting under the superload length line. The Kingpin Law Checker works out the kingpin limit for each state. Run it alongside this checker when the load is long: the two tests answer different questions. Either one can stop the move.
The permit type follows the same ladder. A routine oversize permit covers the load up to the superload line. A superload permit covers it above the line. A trip permit covers a different problem: a vehicle that lacks the registration or fuel credentials for a state. The Trip Permit Checker works out which trip permits a vehicle needs. A superload move can need all three: the superload permit for the size, the trip permit for the credentials, plus the escort arrangements for the route.
What changes when a load becomes a superload?
Four things change when a load crosses the superload line: the review, the route, the escort, plus the lead time. Each one adds cost plus days to the move. A carrier that plans for all four quotes the job right. A carrier that plans for none of them learns about them from the permit office, late.
The review is the bridge analysis. The state checks every bridge on the proposed route against the load axle weights plus spacings. A bridge that cannot carry the load forces a detour, a different axle layout, or a load reduction. Georgia requires a full bridge analysis for every Superload Plus move over 180,000 lb, with axle weights plus spacings supplied on the application. Oklahoma defines its superload class entirely by the bridge question: a load is a superload when its axle configuration exceeds the Standard Drawing OL-1 trucks the state bridges were designed for. Texas requires structural evaluation of individual bridges for every superheavy load over 254,300 lb. The analysis is engineering work, done by engineers, on the state clock. It is the main reason superload permits take weeks.
The route is the route survey. The carrier, or a surveyor the carrier hires, drives the route and records every clearance, turn, grade, plus overhead obstruction. Missouri requires a route survey for all superloads. Michigan requires a Route Survey Certification with the application, filed at least 10 working days ahead. Nevada requires a route survey over 18 ft high. New Hampshire requires a physical route survey over 13 ft 6 in high or 110 ft long, plus an engineer inspection report. The survey protects the load plus the infrastructure: a bridge hit or a stuck load costs more than any survey.
The escort is the police or pilot car requirement. New York requires police escorts for all superloads. North Carolina requires a State Highway Patrol escort over 16 ft wide, per Publication SL-6. Connecticut moves its superloads at night only, usually with State Police escorts. Other states set the escort by dimension or by route. Some leave it to the permit conditions. The Escort and Pilot Car Checker works out the escort rules for a load in each state. Book the escort early: police escorts are scheduled around the permit, not the other way around.
The lead time is the calendar cost. Washington wants the application in writing 30 days ahead over 200,000 lb, plus 7 calendar days ahead over 16 ft wide or high. California wants variance requests at least 30 days ahead. North Carolina, Nevada, Michigan, plus Virginia want 10 working or business days. Alaska wants 5 business days. Utah review may take up to 14 days, during business hours only. Vermont engineering review can take up to 10 working days. Montana decides Class 1 moves within 2 working days plus Class 2 within 5. These are the published minimums. A complex route or a bridge that needs analysis takes longer. This checker shows the lead time where the state publishes one, in the action list under the result.
Two more conditions follow the permit. Signs plus flags: most states require OVERSIZE LOAD signs, flags, plus lights on a superload, with the exact placement set by the permit conditions. The Oversize Sign and Flag Checker lists the sign, flag, plus light rules state by state. Curfews plus holidays: many states restrict superload movement to daylight hours, ban weekend travel, or ban travel on listed holidays, with metro rush-hour curfews on top. The Oversize Curfew and Holiday Checker lists the curfew plus holiday rules state by state. The Texas Oversize Curfew and Holiday Checker covers the Texas rules in full, including the sunrise-to-sunset daylight rule plus the six restricted holidays.
What are the superload thresholds by state?
The table below lists the superload line for every state plus the District of Columbia, as verified against the state rule or the state DOT page on November 19, 2026. A load is a superload in a state when it crosses any one of the four numbers for that state. The word over means strictly above the figure. A cell that says or more fires at the figure itself. A cell that says No line means the state sets no trigger on that measure. The source tier column shows how the figure was verified: P means the rule text or the state DOT page itself, C means two or more secondary sources quoting the state rule plus agreeing, S means one secondary source quoting the state rule, plus N means not verified.
Five states need a note that a table cell cannot carry. Texas sets no dimension trigger: superheavy means over 254,300 lb gross, or 200,001 to 254,300 lb with axle spacing under 95 ft, or over the maximum permit axle or group weights. Oklahoma sets no figure at all: a superload is any overweight permit load that exceeds the Standard Drawing OL-1 trucks. Florida has no formal superload class: the figures shown are the PAS self-issue ceiling, above which the State Permits Office reviews the move as non-routine. Colorado runs a Chapter 6 Special permit for loads of 200,000 to 500,000 lb, with the superload line at 500,000 lb or more. Georgia runs two tiers: Superload to 180,000 lb, then Superload Plus above it, with a full bridge analysis.
| State | Width | Height | Length | Weight | Tier |
|---|---|---|---|---|---|
| Alabama | Over 16 ft | Over 16 ft | Over 150 ft | Over 300,000 lb | P |
| Alaska | Over 18 ft | Over 18 ft | Over 150 ft | 250,000 lb or more | P |
| Arizona | Over 14 ft | Over 16 ft | Over 120 ft | Over 250,000 lb | C |
| Arkansas | Over 16 ft 6 in | 15 ft 6 in or more | 100 ft or more | 180,000 lb or more | P |
| California | Over 15 ft | Over 17 ft | Over 135 ft | No line | P |
| Colorado | Over 15 ft | No line | No line | 500,000 lb or more | P |
| Connecticut | Over 16 ft | Over 16 ft | Over 150 ft | Over 200,000 lb | C |
| Delaware | 15 ft or more | 15 ft or more | 120 ft or more | Over 120,000 lb | P |
| District of Columbia | Not verified | N | |||
| Florida | Over 16 ft | Over 18 ft | Over 150 ft | Over 200,000 lb | C |
| Georgia | Over 16 ft | Over 16 ft | No line | Over 150,000 lb | P |
| Hawaii | Not verified | N | |||
| Idaho | Not verified | N | |||
| Illinois | Over 14 ft 6 in | Over 15 ft | Over 145 ft | Over 100,000 lb on 5 axles, over 120,000 lb on 6 or more | C |
| Indiana | Over 16 ft | Over 15 ft | Over 110 ft | No line | P |
| Iowa | Over 18 ft | Over 18 ft | Over 120 ft | Over 156,000 lb | C |
| Kansas | No line | No line | No line | Over 150,000 lb | P |
| Kentucky | No line | No line | No line | Over 200,000 lb | S |
| Louisiana | Not verified | N | |||
| Maine | Over 16 ft | Over 15 ft | 125 ft or more | Over 160,000 lb | P |
| Maryland | Over 16 ft | Over 16 ft | Over 120 ft | Over 150,000 lb | P |
| Massachusetts | Over 14 ft 11 in | Over 14 ft 11 in | Over 115 ft | Over 130,000 lb | C |
| Michigan | Over 16 ft | Over 15 ft | Over 150 ft | No line | C |
| Minnesota | Over 16 ft | Over 16 ft | Over 150 ft | Over 250,000 lb | C |
| Mississippi | Over 17 ft | Over 15 ft 7 in | Over 120 ft | 189,999 lb or more | P |
| Missouri | Over 16 ft | Over 16 ft | Over 150 ft | Over 160,000 lb | P |
| Montana | Over 18 ft | Over 17 ft | Over 150 ft | No line | P |
| Nebraska | Over 16 ft | Over 16 ft | Over 100 ft | Over 160,000 lb | C |
| Nevada | Over 17 ft on 2 to 3 lanes, over 19 ft on 4 or more | Over 18 ft | Over 200 ft | Over 500,000 lb | P |
| New Hampshire | Over 15 ft | Over 13 ft 6 in | Over 110 ft | Over 149,999 lb | P |
| New Jersey | Not verified | N | |||
| New Mexico | No line | No line | No line | Over 200,000 lb | C |
| New York | Over 16 ft | 16 ft or more | Over 160 ft | 200,000 lb or more | P |
| North Carolina | Over 16 ft | No line | No line | Over 132,000 lb | P |
| North Dakota | Over 18 ft | Over 18 ft | Over 200 ft | Over 250,000 lb | C |
| Ohio | Over 14 ft | Over 14 ft 6 in | No line | Over 120,000 lb | C |
| Oklahoma | No figure: superload means exceeding the Standard Drawing OL-1 trucks | P | |||
| Oregon | Over 14 ft on two-lane, over 16 ft on Interstate plus multilane | Over 17 ft | Over 150 ft | No line | P |
| Pennsylvania | Over 16 ft | No line | Over 160 ft | Over 201,000 lb | P |
| Rhode Island | Not verified | N | |||
| South Carolina | Over 16 ft | No line | Over 125 ft | Over 130,000 lb | C |
| South Dakota | Not verified | N | |||
| Tennessee | Over 16 ft | Over 15 ft 6 in | No line | Over 165,000 lb | P |
| Texas | No line | No line | No line | Over 254,300 lb, or 200,001 to 254,300 lb with axle spacing under 95 ft | P |
| Utah | Over 17 ft | Over 17 ft 6 in | No line | Over 300,000 lb | P |
| Vermont | Over 14 ft 11 in | Over 13 ft 11 in | Over 99 ft | Over 150,000 lb | C |
| Virginia | Over 15 ft | Over 15 ft | Over 150 ft | No line | P |
| Washington | Over 16 ft | Over 16 ft | Over 125 ft | Over 200,000 lb | P |
| West Virginia | Over 15 ft on two-lane, over 16 ft on 4-lane | Over 16 ft | No line | Over 120,000 lb | S |
| Wisconsin | Not verified | N | |||
| Wyoming | Over 18 ft | Over 17 ft | Over 120 ft | Over 160,000 lb | P |
Table date-stamped November 19, 2026. States change rules without notice. Confirm the line with the permit office before you move.
Three patterns in the table are worth noticing. First, the width line clusters at 16 ft: 19 states draw it there, which makes 16 ft the most common single number in the table. A load 16 ft 1 in wide is a superload in most of the country. Second, the weight line spreads far wider than the width line: the lowest is 100,000 lb in Illinois on 5 axles, the highest is 500,000 lb in Nevada plus Colorado. A load of 200,000 lb is a superload in 21 states plus routine in the rest. Third, the length line is the one carriers forget. Nebraska draws it at 100 ft, Arkansas at 100 ft or more, Vermont at 99 ft. A 110 ft load is a superload in those three states on length alone, even at legal width plus weight.
The inclusive lines deserve care, because a load exactly at the figure gets a different answer by state. Delaware fires at 15 ft or more wide or high, plus 120 ft or more long. Arkansas fires at 15 ft 6 in or more high, 100 ft or more long, plus 180,000 lb or more, while its width line stays strict at over 16 ft 6 in. New York fires at 16 ft or more high plus 200,000 lb or more, while its width plus length lines stay strict. Alaska fires at 250,000 lb or more. Mississippi fires at 189,999 lb or more. Maine fires at 125 ft or more. Colorado fires at 500,000 lb or more. The checker applies each line as written, inclusive or strict, so a load exactly on the line gets the right verdict in each state.
Which states have no verified superload definition?
Seven states plus the District of Columbia publish no superload definition this checker could verify from a primary source. The tool gives no verdict for them. That is a deliberate choice, not a gap: a made-up line would be worse than no line. Each one has its own reason.
Idaho has no superload definition in IDAPA 39.03.01, the rule that governs oversize plus overweight permits. Some compilations list 129,000 lb as an Idaho superload figure, but that number is the extra-length plus excess-weight annual tier, not a superload line. Louisiana publishes no superload definition either. Its 2026 regulations ask for detailed information 4 to 6 weeks ahead for very heavy loads over 232,000 lb off designated highways or 254,000 lb on any highway, but that is a lead time rule, not a definition. South Dakota does not use a superload label at all. Loads over 200,000 lb, overweight plus wider than 12 ft, or over 16 ft high take longer to review, but the state draws no superload line.
Rhode Island uses an Extra Large Vehicle or Load Permit instead, with no published thresholds in the manual. Hawaii reported no superload figures to the GAO in 2015. Its administrative rules carry no superload tier. New Jersey publishes no superload weight or dimension class: SUPERLOAD is the name of the NJDOT online permitting system, not a load category. Heavy moves are controlled through route review. Wisconsin Trans 254 covers single trip permits generally, with no superload tier. The District of Columbia sets police escort triggers at 75 ft long, over 13 ft 6 in high, or 120,000 lb or more, but those are escort rules, not a superload class.
For these eight jurisdictions, the only safe answer is the permit office. Call before you quote the move. Ask what the state calls its heaviest review tier, what figures trigger it, plus how long the review takes. The answers vary by route plus by load, which is exactly why no published line exists to check against. The checker flags these states as not verified so the gap is visible, instead of hiding it behind a borrowed figure from a compilation that may be wrong.
What does a superload check look like in practice?
Take a transformer move from Houston to Kansas City: 16 ft 6 in wide, 14 ft high, 110 ft long, 175,000 lb, on 6 axles, with axle spacing of 95 ft or more, running Interstate highways through Texas, Oklahoma, Kansas, Missouri, plus Arkansas. The checker runs each state in turn. Texas is routine: 175,000 lb sits under the 200,000 lb band where spacing starts to matter. Oklahoma needs a closer check: the load is overweight, so superload status turns on the axle configuration against Standard Drawing OL-1. Kansas is a superload on weight: 175,000 lb is over the 150,000 lb line. Missouri is a superload twice over: 16 ft 6 in is over the 16 ft width line, plus 175,000 lb is over the 160,000 lb weight line. Arkansas is a superload on length: 110 ft is over the 100 ft or more line, even though the width sits exactly at the 16 ft 6 in line without crossing it.
The same move also shows the routine envelope: the largest load that stays routine in every state checked. For this route it is 16 ft wide, 15 ft 5 in high, 99 ft long, plus 150,000 lb. The width comes from Missouri, the height from Arkansas inclusive line, the length from Arkansas, plus the weight from Kansas. A carrier that can split the load or reconfigure the trailer to fit inside that envelope avoids the superload review in all five states. A carrier that cannot fit knows exactly which states need the special review plus what each one will ask for.
Take a second move: a wind turbine blade, 14 ft wide, 12 ft high, 180 ft long, 90,000 lb, on 9 axles, running from the Port of Houston to a site in West Texas, all inside Texas. Texas has no dimension trigger, so the blade is not superheavy on any measure: 90,000 lb is far under the weight bands. The same blade crossing into New Mexico is still not a superload, because New Mexico sets no dimension trigger either. Cross into Oklahoma and the answer is still a check, not a verdict, because Oklahoma has no dimension figure. But run that blade through Nebraska and it is a superload on length: 180 ft is over the 100 ft line. Run it through Vermont and it is a superload on length plus width is fine: 180 ft is over the 99 ft line. Length is the quiet trigger. A load that looks routine on weight can be a superload on length alone. The states with the shortest length lines are the ones a long-load carrier must watch.
How do you use the Superload Threshold Checker?
Work through the fields in order. The tool updates with every change, so you can fix an answer and watch the verdict change.
- Enter the load width in feet plus inches, then the height the same way.
- Enter the overall length in feet plus the gross weight in pounds.
- Enter the number of axles, the overall axle spacing, plus the highway type.
- Pick the states the load will cross, or select all to check the full route.
- Read the verdict for each state, the threshold crossed, plus the routine envelope.
- Copy the summary for the permit file or the quote.
Measure the load before you enter it. The width plus height that matter are the overall figures including the load, not the trailer deck. A load that overhangs the trailer counts at its widest point. The length that matters is the full combination, tractor plus trailers plus load, except in Washington, where the length line covers the trailing unit or units plus load. The weight that matters is the gross vehicle weight including the load. Guess the figures and the verdict is a guess. Measure them and the verdict is the state rule applied to real numbers.
Read the routine envelope before the action list. It names the largest load that stays routine in every state checked: the widest, tallest, longest, plus heaviest load that draws a routine permit everywhere on the route. A carrier that can reconfigure the load inside the envelope avoids the superload review entirely. A carrier that cannot fit knows exactly which states need the special review plus what each one will ask for. The envelope is the most useful number on the page for a dispatcher deciding whether to split a load.
Questions carriers ask
What is the superload limit in Texas?
Texas calls it superheavy, not superload. A load is superheavy when the gross weight exceeds 254,300 lb, or when the gross weight sits between 200,001 and 254,300 lb with overall axle spacing under 95 ft, or when any axle or axle group exceeds the maximum permit weights. Texas sets no dimension trigger: a wide or tall load is not superheavy on size alone. Apply through TxPROS three to four weeks before the move, unless an approved route is already on file.
What weight is considered a superload?
There is no single number. The weight line runs from 100,000 lb in Illinois on 5 axles to 500,000 lb in Nevada plus Colorado. Most states set it between 150,000 and 250,000 lb. A load of 200,000 lb is a superload in 21 states plus routine in the rest. Six states set no fixed gross weight figure: California, Indiana, Michigan, Montana, Oregon, plus Virginia. In Montana a load that needs Bridge Bureau approval is a superload on configuration plus route, whatever the scale reads.
How wide is a superload?
Most states draw the width line at 16 ft: 19 states use that figure. The range runs from 14 ft in Arizona plus Ohio to 19 ft in Nevada on highways with 4 or more lanes. Three states set a tighter line on two-lane highways: Nevada at 17 ft, Oregon at 14 ft, plus West Virginia at 15 ft. A load 16 ft 1 in wide is a superload in most of the country. A load exactly 16 ft wide is routine in the states that draw the line at over 16 ft, which is most of them.
Does a superload need a police escort?
It depends on the state. New York requires police escorts for all superloads. North Carolina requires a State Highway Patrol escort over 16 ft wide. Connecticut moves its superloads at night only, usually with State Police escorts. Other states set the escort by dimension or by route. Some leave it to the permit conditions. The escort rules change with the load, so check them for each state on the route rather than assuming one rule covers the trip.
How far in advance do you apply for a superload permit?
It varies by state plus by load. Washington wants the application in writing 30 days ahead over 200,000 lb. California wants variance requests at least 30 days ahead. North Carolina, Nevada, Michigan, plus Virginia want 10 working or business days. Alaska wants 5 business days. Utah review may take up to 14 days. Vermont engineering review can take up to 10 working days. Montana decides Class 1 moves within 2 working days plus Class 2 within 5. These are the published minimums. A route that needs a bridge analysis takes longer.
What is the difference between a superload and a superheavy load?
Superheavy is the Texas name for its weight-based class. Superload is the general term most other states use. The idea is the same: a load above the routine permit ceiling that needs special review. Other states use their own names too. California calls it a variance permit. Maine calls it an extreme load. New Hampshire calls it a supermove. Arizona calls it a Class C special permit. The label changes by state. The treatment is the same: a bridge analysis, a route survey, police escorts where required, plus a longer lead time.
Related tools
- Federal Size Limits Checker: work out the federal legal size plus weight limits for a vehicle before you check the superload line.
- State Legal Limits Table: the legal size plus weight limits state by state, the baseline every permit starts from.
- Kingpin Law Checker: work out the kingpin to rear axle limit for each state, the length rule that bites before the superload line.
- Escort and Pilot Car Checker: work out the escort plus pilot car rules for a load in each state.
- Trip Permit Checker: work out which trip permits a vehicle needs for the states on the route.
- Oversize Sign and Flag Checker: the sign, flag, plus light rules for oversize loads state by state.
- Oversize Curfew and Holiday Checker: the daylight, curfew, weekend, plus holiday rules for oversize loads state by state.
- Texas Oversize Curfew and Holiday Checker: the Texas curfew plus holiday rules in full, including the sunrise-to-sunset daylight rule plus the six restricted holidays.
Sources
- TxDOT Superheavy Loads (Texas Department of Transportation, read Nov 19, 2026)
- NYSDOT Superloads (New York State Department of Transportation, read Nov 19, 2026)
- Alaska DOT and PF Superload Notice (Alaska Department of Transportation and Public Facilities, read Nov 19, 2026)
- GAO-15-235SP, Transportation Safety: Results of Collection of Information on State Permitting Practices for Oversize Vehicles (Government Accountability Office, February 2015; used as a lead only, never as verification)
- Washington: WAC 468-38-405 plus WSDOT Superloads page. Utah: UDOT Oversize and Overweight Provisions page. Pennsylvania: 67 Pa. Code 179.1 plus PennDOT form M-936A. North Carolina: NCDOT Oversize and Overweight Permit Handbook plus Publication SL-6. California: Caltrans Transportation Permits page plus FAQ Q14. Nevada: NDOT Over Dimensional Vehicles page. Colorado: 2 CCR 601-4 chapter 6 section 609 plus CRS 42-4-510(1.7). Montana: ARM 18.8.509 plus MDT Permitting FAQ. Oregon: ODOT Oregon Superloads page. Wyoming: WHP Commercial Carrier page plus WYDOT overview. Georgia: Ga. Comp. R. 672-2-.01. Tennessee: Tenn. Comp. R. 1680-07-01-.12. Mississippi: MDOT Super Load Guidelines. Alabama: ALDOT Superload Requirements memo. Missouri: MoDOT Route Surveys for Superload Moves. Arkansas: 27 CAR section 111-110 plus ARDOT blog. Virginia: 24VAC20-82-60 plus VDOT IIM-TOD-14-05.2. Kansas: K.A.R. 36-1-35 plus 36-1-38. Oklahoma: OAC 730:50-3-2(m). Maine: 29-250 CMR chapter 157 section 1. Maryland: MDOT SHA Overdimensional Permit Limitations plus COMAR 11.04.03.02. Delaware: 2 Del. Admin. Code 2405. New Hampshire: NH Admin Rules Tra 304.12(c). Indiana: 105 IAC 10-1.5-2(11). All read Nov 19, 2026.
- Florida: FDOT State Permits Office page, via five secondary sources quoting it. Arizona: 17 A.A.C. 6, via three secondary sources. Illinois: 92 Ill. Adm. Code 554.1320, via three secondary sources. Ohio: ODOT plus county permit office working line, via two secondary sources. New Mexico: NMDOT Bridge Section, via two secondary sources. North Dakota: SC and RA Permit Manual sourced from NDHP documents. Michigan: MDOT form T-2, via four secondary sources. Minnesota: MnDOT Commercial Vehicle Resource Book 2026 section 06, via two secondary sources. South Carolina: SCDOT Guidelines for Movement of OSOW Vehicles and Loads, Rev. 3/2026, via four secondary sources. Iowa: routine permit limits, via two secondary sources plus IAC 761-511.15. Nebraska: 408 NAC chapter 3, via three secondary sources. Connecticut: CTDOT pages plus FAQ, via two secondary sources. Vermont: routine permit limits, via three secondary sources. Massachusetts: 700 CMR 8.00, via four secondary sources. Kentucky: KYTC Overweight and Over-Dimensional Summary Document via OpenEI, one secondary source. West Virginia: Titan routine limits page, one secondary source. All read Nov 19, 2026.